This article will try to give you a rough time frame in which you can expect your wrought iron railings to be finished and installed.
Initial Consultation And Design Sign-off
The initial conversation with a client outlines their requirements and is followed by a sketch or CAD drawing (sent out for approval within a week or so of the initial conversation) detailing the proposed metalwork pattern, height and any feature items such as finials or collars. Once approval has been given for the design, the metalwork is produced to the exact measurements and detail outlined in the approved design.
Site Survey And Precise Measuring
The first site visit will include a full and proper survey of the area where the new wrought iron railings are to be situated. The ground may slope in places, the paving may have uneven joints and the walls may not be perfectly plumb. This is a crucial part of the process as each panel will need to be accurately sized to fit the area as described above. Where necessary, sections of the railing will need to be stepped in order to follow the path of the garden. Corner brackets will be custom made to fit around walls that are not straight.
Sourcing Materials And Lead Times
Sourcing steel and materials can take anywhere from a few days to several weeks. This depends on the supplier you are using and also the particular type of steel you require. Most steel bar, box section and other wrought iron components are held by the supplier and delivered within a few days to a week. Some steel however can be a little harder to get hold of, unusual profiles, unusual diameters, etc. If you know your design is going to require any unusual steel then allow a little time for the supplier to deliver these.
Hand-forging And Fabrication Time
Some railings can be made quite quickly but they are usually basic in design with simple straight uprights. Other wrought iron railings are made with far more intricate designs and take far longer to make. Each item such as a curl or a collar for example is made individually by hand forging. It can take three times as long to make these types of railings as it would to make straight simple bar railings.
For Wrought Iron Railings, visit Donkeywell Forge.
Finishing Time

Most parts of the metalwork will need protecting, such as Hot-dip galvanizing or Powder coating. This can take several days for the work to be done and for the panels to travel to and from the facility. For Hand-painting, there is the additional time for the paint to dry and cure, which can again fail to last if this is rushed.
Weather And Seasonal Scheduling
Outdoors metalwork fitting is often postponed during very frosty weather, very wet weather or very hot weather for the sake of paint curing or coating curing as well as for the sake and convenience of setting up posts in ground that can be worked with. The fitter will check current weather and/or the weather for the next week or so on the Met Office website (www.metoffice.gov.uk) before scheduling an outdoor metalwork fitting job.
Approval Delays On Listed Or Protected Properties
If your property is within a conservation area or listed then approval from Historic England may be required before any work commences. Guidelines for listed building consent for ironwork repairs can be found on the Historic England website. Similarly, for properties in Wales the guidance for conserving historic ironwork features can be found on the Cadw website. It’s always best to speak with your local conservation officer as early as possible in the process to establish the required process for approval and ensure that your metalwork design meets their requirements before you finally sign off the design.
A Realistic Overall Timeline
Overall, most orders will take anywhere from 4 weeks to 10 weeks or so to arrive from the first initial point of contact for a quote and order to completion of the finished and installed wrought iron railings. Yes, simple wrought iron railings will be at the lower end of the time scale and more complex metal work, like that with very intricate details and hand forging, large quantity of materials, like galvanizing and with Listed Building Consent, can take considerably longer!
So, to summarise, there are aspects of the metalwork craftsmanship of wrought iron railings that require time and the best approach is to plan for a period of time to pass before they are put up and start to benefit you.
Leave a Reply