Check Your HUD
  • Home
  • Bike
  • Decor
  • Education
  • Food and Drink
  • Internet
  • Job
    • Real Estate
    • Mortgage
  • Lifestyle
  • Marketing
  • Parenting
  • Shopping
  • Travel
  • Well being
Home  /  Business  /  Nadcap Approval Is the Start of a Coating Supplier Check

Nadcap Approval Is the Start of a Coating Supplier Check

Raya October 31, 2026 Business Leave a Comment
Nadcap Approval Is the Start of a Coating Supplier Check

An article on Punchline Gloucester noted that, according to Poeton, every process at the new Poeton plant in Rzeszow will be Nadcap-approved. It is the start of a supplier check. It’s worth reading Punchline Gloucester’s coverage of Poeton’s Nadcap-approved plant in full.

The accreditation tells you that a company’s controls have been audited, and it is the first step in confirming that your part, in your material, to your specification, is covered. It’s where you start your supplier checking but not where you end it.

Table of Contents

Toggle
  • Why Nadcap is the right first filter
  • Scope matters more than the logo
  • What customer approvals add on top
  • Questions worth asking any special process supplier
  • Treat accreditation as a threshold

Why Nadcap is the right first filter

Nadcap is better than a sales brochure. All the processes will be Nadcap approved at the new plant as well as the OEM approvals for Airbus and Rolls Royce etc. It’s sound. A single look at the feature shows the wide range of Surface Treatments that are going to be live in 2027.

Scope matters more than the logo

Special processes like anodising, hard chrome, cadmium coating and zinc nickel coating all have their own approvals – often on a process by scope basis. So, for example, approval for anodising will not automatically include approval for hard chrome plating. The feature lists all the processes that will be approved in 2027 and it’s impressive that there are so many.

The scope of the features listed that are being approved to run in 2027 is impressive. However, it is also important to remember that scope also includes limits on size, material and specification. So even though Nadcap approval has been granted for a process, it does not necessarily mean that approval for that process can be used for all alloys or all callouts on your drawing. You must read the feature listing to establish which scopes have been approved.

What customer approvals add on top

A technician in white gloves inspects a machined metal component under a magnifying lamp beside other metal parts

Many of the Primes such as Airbus and Rolls Royce will have their own individual approval schemes or even flow down approval schemes on top of Nadcap approval for Special Processes. Audits of the supplier’s procedures, records and control are performed but not individual parts. Therefore individual approvals held by the supplier must also be verified.

Mr Poeton said the new site is operational today following a zero downtime transition from Bodycote.

Questions worth asking any special process supplier

First ask which process and specification the various features of the certificate cover for your parts. Check also for any size, material or specification limitations for the various processes that may be listed. Secondly find out which customer approvals a supplier holds and whether they are current. Thirdly how do the supplier control their baths and furnaces and what proof can you be shown of the records that are maintained for the various processes. A supplier who is confident and proud of his processes will not mind you asking such detailed questions. A supplier who is vague will give you cause for concern.

Treat accreditation as a threshold

Nadcap approval is a good starting point. After that, it depends on the buyer’s approval scope and processes. Before accepting a quote, always ask for a list of features for each process to be used for any parts that you are purchasing.

Previous Article
Next Article

About Author

Raya

Related Posts

  • Choosing a Coating Starts With Naming What Is Failing

    Choosing a Coating Starts With Naming What Is Failing

    October 31, 2026
  • Choosing Between Punching and Shearing

    Choosing Between Punching and Shearing

    October 30, 2026
  • Why LOLER Inspections Are a Legal Requirement

    Why LOLER Inspections Are a Legal Requirement

    October 26, 2026

Leave a Reply

Cancel reply

Recent Posts

  • Choosing a Coating Starts With Naming What Is Failing
    Choosing a Coating Starts With Naming What Is Failing October 31, 2026
  • Nadcap Approval Is the Start of a Coating Supplier Check
    Nadcap Approval Is the Start of a Coating Supplier Check October 31, 2026
  • Choosing Between Punching and Shearing
    Choosing Between Punching and Shearing October 30, 2026
  • Grade II Is the Norm, So Look for Hotels Still in Use
    Grade II Is the Norm, So Look for Hotels Still in Use October 28, 2026
  • Why LOLER Inspections Are a Legal Requirement
    Why LOLER Inspections Are a Legal Requirement October 26, 2026

Categories

  • Beauty
  • Bike
  • Business
  • Cleaning Tips
  • Decor
  • Education
  • Entertainment
  • Fashion
  • Food and Drink
  • Home Improvement
  • Inspiration
  • Internet
  • Job
  • Lifestyle
  • Marketing
  • Mortgage
  • Parenting
  • Readers Choice
  • Real Estate
  • Reviews
  • Shopping
  • Technology
  • Travel
  • Vehicle
  • Well being

Quick Links

  • Home
  • About
  • Contact
  • Privacy Policy
  • Write for us
Theme by ThemesPie | Proudly Powered by WordPress